‹ Training
TJS Training · Installing Fire Lines

Fittings & restraint

Lesson 6 of 9About 7 minutesAlso counts for: Large water
  1. 1Prep & layout
  2. 2Stations
  3. 3Tie-in to the city main
  4. 4Detector check
  5. 5Bed & lay
  6. 6Fittings & restraint
  7. 7Fire riser
  8. 8Cover it right
  9. 9Flush & test

Watch

Megalug on an MJ fitting · PVC pipe
SIDE VIEW Pipe Megalug (red = PVC) MJ fitting

The steps

Megalugs go on mechanical joint (MJ) fittings. A push-on pipe joint does not get a Megalug. When the plans call for restraining a pipe bell, that is a bell restraint, a different part.

  1. Clean it with a clean rag. Inside the pipe end, the outside of the pipe end, and inside the fitting. No dirt or grit anywhere: dirt in a joint is how it leaks and gets dug back up. Then brush the gasket and the pipe end with soapy water or approved pipe lube right before the gasket goes on.
  2. Gland on first, then the gasket. Slide the gland on over the pipe end, lip facing the end. Then slide the gasket on the same way, narrow edge toward the end.
  3. Push the pipe in straight. Press the gasket into the fitting evenly all the way around.
  4. Seat the gasket flush. Look all the way around: the gasket sits flush with the face of the fitting, no spot sticking out. If it isn't, tap it in with a small hammer until it is.
  5. Slide the gland up and center it. Lip against the gasket. T-bolts in, nuts hand-tight.
  6. Keep it straight. No bend at the joint, not even a little. It rolls or pinches the gasket. If the line needs a turn, use a fitting.
  7. Torque the T-bolts: bottom, top, the two sides, then the rest. Go around again until every bolt reads 75–90 ft-lb on the torque wrench (4–24 in; a 3 in is 45–60 ft-lb). Keep the gap between the gland and the fitting the same all the way around.
  8. Check the gap all the way around. The gland and the face of the fitting have to be the same distance apart everywhere. If one side is farther away, the gasket gets squeezed on one side and not the other, and that joint can leak. Work the T-bolts on the wide side up a little at a time until it is even, staying in 75–90 ft-lb.
  9. Breaker bolts: hand-tight first, until every wedge touches the pipe. Then turn them clockwise, the way the arrow on the nut points, a little on each, around and around, until every head breaks off.
  10. Before it gets covered: every head gone, gap even. Take the photo.
  11. Poly wrap it. Cover the whole fitting and the gland on both sides of it with poly, and tape it closed. Then take a second photo with it wrapped.

If it ever has to come apart, the 5/8 in hex heads under the breaker heads are there for that. Put it back to 90 ft-lb.

Your photo

In TJS Field

Two photos of every fitting, both before any dirt goes on it: one before the poly, one after it is wrapped.

  1. Open TJS Field.
  2. Pick the job.
  3. Tap the camera button, 📷 Take a photo, and take the picture.
  4. Tag it Fitting / valve.

Photo 1, before the poly

  • Every breaker head is gone
  • The gland sits even on the fitting, same gap all the way around
  • Close enough that Rob can see the bolts

Photo 2, wrapped

  • Poly covers the whole fitting and the gland on both sides
  • Taped closed, no tears

Check

3 questions · get all 3